虚拟建造

在项目开展之前,预先进行虚拟建造从设计、
施工到管理的模型化、参数化、模式化、提高项目可控性,
从而达到在整个项目中的经济可控、进度可控、质量可控。

Before the project is carried out, the virtual construction from the design,
construction to management of the model, parameterization, model,Improve project controllability,
so as to achieve the entire project in the economy controllable, schedule control, quality control.

移动多规系统

Mobile multi-gauge system
把施工信息引入到设计全过程,利用仿真技术来优化建筑和结构设计,从而在设计阶段即可对所设计的建筑甚至构件的制作、安装进行可实现性分析-包括施工过程的工艺分析、力学分析、运动部件的运动学和动力学分析等.,以及工期、成本、质量等的分析,它主要解决“设计出来的建筑是怎样的建筑”的问题。

The construction information into the design process, the use of simulation technology to optimize the construction and structural design, which in the design phase of the design of the building and even the production and installation of the implementation of the feasibility analysis - including the construction process of process analysis, mechanics Analysis, kinematic and kinetic analysis of moving parts, etc., as well as analysis of duration, cost, quality, etc. It mainly solves the problem of "what kind of building is designed".

施工为核心的虚拟建造

Construction as the core of the virtual construction
施工过程模型中融入仿真技术,以此来评估和优化施工过程,以便低费用、快速地评价不同的施工方案、材料需求规划、工期安排等,其主要目标是评价施工的合理性。

Construction process model into the simulation technology, in order to evaluate and optimize the construction process, in order to low cost, quickly evaluate the different construction plans, material requirements planning, duration arrangements, the main objective is to evaluate the rationality of construction.

管理控制为中心的虚拟建造

Management control as the center of the virtual construction
将仿真以及其他管理应用软件加到控制模型和实际处理中,实现基于仿真的计划管理控制系统。它利用计算机软硬件的强大功能,将建造过程的相关管理要素进行计划和实施控制,使之和具体建造过程相对应。它主要解决“应如何去管理和控制”的问题。

The simulation and other management applications added to the control model and the actual processing, to achieve simulation-based planning management control system. It uses the power of computer hardware and software, the construction process of the relevant management elements of the planning and implementation of control, so that the corresponding construction process corresponds. It is mainly to solve the "how to manage and control" problem.